QRC Emergency Action Plan – Coventry, RI

55 Welthian Court
Warwick, RI
Completion Date: 2006
Total Project Value: $15,000
Relevant Project Features:
• Prepared the Emergency Action Plan
• Coordinated with Town, State, and Emergency Management Agency Officials
• Presided at the Orientation Seminar for those having a role or interest in the EAP
RT Group, Inc. (RTG) was retained by the Quidnick Reservoir Company (QRC) to prepare the Emergency Action Plan (EAP) for the Flat River Reservoir Dam. The Flat River Reservoir Dam is a High-Hazard earth and masonry dam that was constructed in about 1878.
The EAP was prepared to establish a basic plan of action if conditions at the dam indicate the potential for downstream flooding, dam failure, or if any individual observes and reports that a dangerous condition is developing at the dam.
As part of this project, RTG coordinated with Town, State, and Emergency Management Agency Officials, and presided at the Orientation Seminar for those having a role or interest in the EAP.
Search Our Site
RTG has an engineering staff that is professionally registered in Rhode Island, Connecticut, Massachusetts, Pennsylvania, Illinois, Ohio, Indiana, Wisconsin, New York, Louisiana and Vermont.
Project Snapshots

