Quidnick Reservoir Dam Inspection – Coventry, RI

Quidnick-Reservoir-Dam-Inspection-1Client: YMCA of Pawtucket
660 Roosevelt Avenue
Pawtucket, RI 02860
Completion Date: 2014
Total Project Value: $3,500.00

Relevant Project Features:

  • Performed a RIDEM File Review
  • Performed a Visual Inspection of an Earthen Dam
  • Prepared a Visual Inspection Report
  • Provided repair recommendations

Quidnick-Reservoir-Dam-Inspection-2

RT Group, Inc. (RTG) was retained by the YMCA of Pawtucket to perform a visual inspection of the Quidnick Reservoir Dam. The YMCA had previously received a Notice of Violation (NOV) from RIDEM requiring an inspection by a qualified firm.

Accordingly, RTG conducted a full RIDEM file review of the dam followed by a visual inspection which encompassed the dam embankment, the downstream area, the spillway, and low-level outlets.

Quidnick-Reservoir-Dam-Inspection-3Upon completing the inspection, RTG prepared a detailed Visual Inspection Report summarizing the findings and providing repair recommendations and implementation schedules.