Dewatering and Treatment System Plan – Berklee Music Center Boston MA

Dewatering and Treatment System Plan 1Client: Lockwood Remediation Technologies, LLC.
127 Hartwell Street, Suite 3
West Boylston, MA
Completion Date: 2012
Total Project Value: NA

Relevant Project Features:

• Prepared the Dewatering and Treatment System Plan
• Treatment System designed to address TSS, elevated pH, and VOC contamination

Dewatering and Treatment System Plan 2RT Group, Inc. (RTG) was retained by Lockwood Remediation Technologies, LLC (LRT) to prepare the Dewatering and Treatment System Plan for the temporary earth support being installed for the construction of the new Music Center at the Berklee College of Music.

Dewatering and Treatment System Plan 3

The Plan included estimating the expected seepage rate into the excavation, specifying the dewatering pumps/wells required to keep the excavation dry, and designing the treatment system in conjunction with LRT. The plan also included passive relief wells/sumps which would allow for excess hydrostatic pressure to dissipate, in the event that the dewatering pumps/wells stopped working.