Dumpling Road Seawall Replacement – Jamestown RI

Dumpling Road Seawall ReplacementClient: Town of Jamestown
93 Narragansett Avenue
Jamestown, RI
Completion Date: 2012
Total Project Value: $220,000

Relevant Project Features: 

  • Completed wave and scour analyses
  • Prepared Plans and Specifications for Permitting and Construction
  • Assisted in preparing the RICRMC and RIDEM Permit Applications

Photo 2

RT Group, Inc. (RTG) was retained by the Town of Jamestown to design a new concrete block seawall to replace the existing seawall located on Dumpling Road.

Replacement was required because the existing cast-in-place concrete seawall was in an active state of failure. As part of design, RTG performed wave loading and scour analyses for designing the new seawall.

In addition to designing the new seawall, the project included the design of a new vehicular curb made integral with the seawall and a new asphalt roadway.