Fixed Timber Pier Repairs – Gales Ferry CT

Photo 1Client: Blakeslee Arpaia Chapman
200 North Branford Road
Branford, CT
Completion Date: 2007
Total Project Value: $350,000

Relevant Project Features:

  • Performed the Pier Inspection
  • Performed Pile Foundation Design and WEAP Analyses
  • Prepared Plans and Specifications for Construction
  • Obtained CTDEP Coordination
  • Provided Construction Observation

Photo 3

When a dump scow impacted an existing fixed timber pier, RT Group, Inc. (RTG) was retained by Blakeslee Arpaia Chapman (BAC) to inspect the damage and develop repair plans and specifications to return the damaged pier and raw product offloading station back into service.

Photo 4RTG worked closely with the Owner of the facility in order to incorporate their material and workmanship standards into the repair plans and specifications, and coordinated with the Connecticut Department of Environmental Protection (CTDEP) regarding the permitting and implementation of the repairs.

Photo 2