Fort Getty Pier Inspection – Jamestown RI

Fort Getty Pier Inspection 1Client: Town of Jamestown
93 Narragansett Avenue
Jamestown, RI
Completion Date: Feb 2014
Total Project Value: $17,000

Relevant Project Features:

• Performed an inspection of an existing pier
• Prepared a Pier Inspection Report
• Provided recommendations for repairs/improvements
• Provided a detailed cost estimate for repairs/improvements

Fort Getty Pier Inspection 2

RT Group, Inc. (RTG) was retained by the Town of Jamestown to inspect an existing WWI era timber pier located in Fort Getty Park.

As part of the project, RTG performed a visual topside inspection of the pier from kayaks and coordinated with a local diver who performed the underwater inspection of the pier.

Following the inspection, RTG gathered the data obtained and prepared an inspection report which summarized deficiencies and provided repair/ improvement recommendations. In addition to the above, RTG also prepared a detailed cost estimate to implement the recommended repairs/improvements.

Fort Getty Pier Inspection